HomeAbout StroudServicesProjectsCareersContact Us
Civil Engineering, Land Surveying, Site Development, Environmental, Mechanical/Electrical, Structural
Stroud Engineering
photo of North Carolina beach

Project: Alma Farms Subdivision

Client: Old 30 Investments, LLC
Location: Onslow County, NC

Stroud Engineering is currently planning a 147 lot residential subdivision for entry level housing. The development will require a wastewater treatment plant with a high rate infiltration basin and a groundwater lowering system. Stroud’s responsibilities include:

  • R-10 Rezoning
  • Special Requirement for wastewater treatment facility
  • Sketch Plan approval through Onslow County
  • Preliminary Plan approval through Onslow County
  • North Carolina Division of Water Quality permitting
    for a Wastewater treatment Plant capable of treating
    53,000 gallons per day
  • Infiltration and Dewatering design for the effluent
  • Design and permitting of highway access
  • Design and permitting of public roads
  • Design and permitting of a sewage collection system
  • Design and permitting of water distribution system
  • Design and permitting of a high density storm water system to satisfy North Carolina Division of Water Quality Coastal Storm Water Management rules
  • Construction administration and inspection

Home  |  About Stroud  |  Services  |  Projects  |  Careers  |  Contact Us

© Stroud Engineering. All Rights Reserved.